How we keep every estimate accurate

Accurate estimates come from a process, not luck. Here's how we check your numbers, and what you can expect at each design stage.

Our five-step quality process

1

Read the full set

Every sheet, addendum and spec section is reviewed before measuring. Missing or conflicting information is flagged to you.

2

Measure by trade

An estimator who knows the trade does the takeoff, and marks up the plans so every quantity can be traced.

3

Price for the location

Labor, material and equipment costs are set for the project ZIP code, or taken from your own suppliers if you prefer.

4

Write the assumptions

Anything the drawings leave open is written down: allowances, exclusions and items we had to assume.

5

Second review

A second estimator checks quantities, unit costs and totals against the drawings before delivery.

How accurate can an estimate be at each design stage?

An estimate can only be as precise as the drawings behind it. The industry groups estimates into five classes, from a concept sketch to complete construction documents. Each step narrows the range.

ClassDesign stageTypical useTypical accuracy range (buildings)
Class 5Concept, 0–2% definedScreening and early feasibilityAbout −20% to −30% low, +30% to +50% high
Class 4Early schematicFeasibility and optionsNarrower than Class 5
Class 3Design developmentBudget approvalNarrower again
Class 2Near-complete documentsCost control and bid preparationClose to bid level
Class 1Complete construction documentsBid or check estimateAbout −3% to −5% low, +3% to +10% high

Source: ASTM E2516-11, Standard Classification for Cost Estimate Classification System (building and general construction). Ranges vary with project complexity and market conditions. That's why we tell you which class your estimate fits, and what would tighten it.

What makes an estimate more accurate

Complete drawings

Construction documents with specs give a far tighter range than early sketches.

Every addendum

The latest revision is the one you will build. Send all of them.

Real location

An exact address or ZIP code lets us price local labor and material.

Clear scope

Knowing exactly what you include and exclude removes guesswork.

Your pricing

Supplier quotes or your own unit costs make the estimate match your business.

Time to review

A realistic deadline leaves room for the second check every estimate gets.

Client to confirm: that every estimate gets a second review by another estimator, and the cost data sources you use (for example RSMeans, supplier quotes or your own historical data).

Accuracy questions

Still have a question? Call +1 (660) 460-1813 or email [email protected].

More FAQs
How accurate are your estimates?

It depends on the drawings. An estimate from complete construction documents falls in a much tighter range than a concept-stage budget. We tell you which class your estimate fits.

What happens if you find an error after delivery?

We correct it. See our Refund & Revision Policy for how corrections are handled.

Do you guarantee the final construction cost?

No estimator can. Market prices, scope changes and site conditions all move final costs. Our job is to give you the most accurate picture the documents allow.