Offices in Missouri, New York and Texas
Aerial view of a marina with docks, boats and blue water

Marine Construction Estimating Services

Docks, piers, seawalls and marine structures priced with equipment and access.

CSI Division 35, Waterway & MarineMarked-up plans24–48 hour turnaround
24–48hrs

typical turnaround

50+ DC

states with local pricing

83

trades across every CSI division

28yrs

average senior estimator experience

EBReviewed by Edward Brooks, CCMSenior Estimator, Sitework & Excavation, 31+ years. Updated November 20, 2026

What do marine construction estimating services include?

Marine construction estimating services cover the takeoff and pricing of piles; decking; and seawalls and bulkheads. Each item is listed with its unit and priced for your project location, and we check for scope bids often miss, such as barge mobilization and turbidity control. Most marine construction estimates are delivered in 24–48 hours for a fixed fee.

  • Checked twiceA second estimator reviews every estimate
  • Priced locallyLabor and material for your ZIP code
  • Fixed feeFree quote, no hourly billing

What we measure

We take off marine construction scope from your drawings and specs, list each item with its unit and price it for the project location if you need costs.

ItemUnit
PilesEA/LF
DeckingSF
Seawalls and bulkheadsLF
DredgingCY
Floating docksSF
Marine equipmentDAY
EB
Senior estimator for this tradeEdward Brooks

Senior Estimator, Sitework & Excavation · 31+ years · Certified Construction Manager (CCM)

View profile

What you receive

  • Itemized quantities with units
  • Material, labor and equipment costs for your location
  • Labor hours by task
  • Marked-up plans
  • Assumptions and exclusions in writing
  • Excel and PDF, or your template

What drives the price

  • Water access
  • Pile type
  • Tides and weather

Scope we often see missed

These items are easy to leave out of a marine construction bid. We check for them on every project.

  • Barge mobilization
  • Turbidity control
  • Permits

How it works

1

Send your plans

Upload drawings, specs and addenda, and tell us your bid date.

2

Get a fixed quote

We email a price and a delivery date. No obligation.

3

We measure and price

An estimator who knows the work builds and checks your estimate.

4

Receive your files

Excel, PDF and marked-up plans, usually within 24–48 hours.

What contractors say about our estimates

Read all client reviews
We needed reliable estimating support for a large construction project, and their team delivered exactly what we expected. The quantity calculations were detailed, communication was professional, and the final estimate was easy to review.
JAJames Anderson
Very satisfied with their material takeoff services. They carefully reviewed our drawings and provided organized quantities for different construction trades. Their professional approach helped us save time during project preparation.
RTRebecca Thomas
Their estimating team provided excellent support for our industrial project. The detailed cost breakdown and clearly organized quantities helped us evaluate project expenses and prepare our proposal more efficiently.
DRDaniel Robinson

Frequently asked questions

Still have a question? Call +1 (660) 460-1813 or email [email protected].

More FAQs
Do you include barges and marine equipment?

Yes. Barges, cranes and work boats are priced by the day, with mobilization shown on its own line.

How long does a marine construction estimate take?

Most are delivered in 24–48 hours. Large projects get a firm delivery date in your quote.

Can you price marine construction for my location?

Yes. We price labor and material for the project ZIP code, or use your own unit prices and supplier quotes.

Who checks a marine construction estimate before I get it?

An estimator who knows the work does the takeoff and pricing, then a second estimator checks the quantities, unit costs and totals against the drawings before delivery.

What drawings do you need for a marine construction takeoff?

Send the full set with specs and addenda. For marine construction, the marine and waterway drawings matter most, but we review the whole set because marine construction scope often shows up on other sheets too.

Which software do you use for marine construction takeoffs?

We measure in PlanSwift, Bluebeam Revu or On-Screen Takeoff, depending on the project, and deliver Excel and PDF files that open on any computer. Native project files are available on request.

Get your marine construction numbers

Upload your plans for a free, fixed-price quote.

Scroll to Top